Title: Approve the Amended and Restated Cooperative Agreement with the Riverside County Flood Control and Water Conservation District for the East Grand Boulevard Storm Drain Project.
Attachments: 1. Staff Report, 2. Exhibit 1 – Location Map, 3. Exhibit 2 – Amended and Restated Cooperative Agreement
REQUEST FOR CITY COUNCIL ACTION




DATE: 10/19/2022

TO: Honorable Mayor and City Council Members

FROM: Public Works Department

SUBJECT:
Title
Approve the Amended and Restated Cooperative Agreement with the Riverside County Flood Control and Water Conservation District for the East Grand Boulevard Storm Drain Project.

End
EXECUTIVE SUMMARY:
This staff report asks for the City Council to approve the Amended and Restated Cooperative Agreement with the Riverside County Flood Control and Water Conservation District (District) to fully fund the design and construction of the East Grand Boulevard Storm Drain Project located between 3rd and 7th Street. This project is part of several projects that will mitigate drainage deficiencies in the downtown areas by connecting to a recently completed storm drain system, Line 52, that outfalls to the Temescal Creek Channel.

RECOMMENDED ACTION:
Recommended action
That the City Council:

a. Approve the Amended and Restated Cooperative Agreement with the Riverside County Flood Control and Water Conservation District for the East Grand Boulevard Storm Drain Project, Project No 2022-16, in the amount of $1,880,000.

b. Authorize the City Manager, or his designee, to execute the Amended and Restated Cooperative Agreement with the Riverside County Flood Control and Water Conservation District to memorialize the mutual understandings by and between the District and City of Corona with respect to funding, design, construction, inspection, ownership, operation, and maintenance of the East Grand Boulevard Storm Drain Project.

c. Authorize an appropriation and an offsetting estimated revenue increase in the amount of $1,430,000 from the Public Works Grants/Agreement Fund (243) to the East Grand Boulevard Storm Drain, Project No. 2022-16.

Body
BACKGROUND & HISTORY:
In June 2019, the City completed Line 52, a storm drain system constructed along Joy Street and a portion of East Grand Boulevard that releases stormwater in...