AGENDA REPORT
REQUEST FOR CITY COUNCIL ACTION
DATE: 3/21/2018
TO: Honorable Mayor and City Council Members
FROM: Public Works Department
SUBJECT:
Title
City Council consideration to authorize the Mayor to execute Grading and Improvement Agreements for 3595 and 3599 Temescal Canyon Road - Griffco Land LLC.
End
RECOMMENDED ACTION:
Recommended action
That the City Council authorize the Mayor to execute Grading and Improvement Agreements between the City and Griffco Land LLC.
Body
ANALYSIS:
Precise Plan, PP16-011 was approved on December 6, 2017 for Parcel Map 37152 to subdivide 3.6 acres into two parcels for light industrial purposes in the business park (BP) designation of the Dos Lagos Specific Plan. The proposed buildings are 30,000 SF approximately each. The project is located in the L1 (Light Industrial) zone as shown on exhibit A.
The owner will enter into an Improvement Agreement with the City and post sufficient securities to guarantee construction of street, sewer, and water public improvements associated with the project.
In compliance with Grading Ordinance No. 2568, the owner will also enter into a Grading Agreement to secure the precise grading operations, which include drainage improvements. A cash deposit has been posted to guarantee erosion control. The grading design conforms to the Grading Ordinance, and is consistent with sound engineering standards and practices. The elevation design minimizes significant height and slope differentials from surrounding properties, while maintaining the City’s obligation to protect the health and safety of citizens and property.
Securities have been posted as follows:
PWGP18-00002 |
Faithful Performance |
Labor and Materials |
|
Security No. |
Amount |
Security No. |
Amount |
Public Improvements |
379545S |
$467,200 |
379545S |
$233,600 |
Grading and Drainage |
379546S |
$68,500 |
N/A |
N/A |
Erosion Control |
Cash Deposit |
$2,500 |
N/A |
N/A |
COMMITTEE ACTION:
Not applicable.
STRATEGIC PLAN:
Not applicable.
FISCAL IMPACT:
All applicable fees have been paid by the developer.
ENVIRONMENTAL ANALYSIS:
In accordance with Section 15063 of the State Guidelines for the California Environmental Quality Act (CEQA) the City prepared an initial study to determine if the project would have a significant effect on the environment. The initial study was prepared in accordance with Section 15063 and per the City's Local Guidelines for Implementing CEQA. The initial study identified environmental effects that were determined not to be significant and identified potentially significant effects that were capable of being mitigated to less than significant. Therefore, the City adopted a Mitigated Negative Declaration and Mitigation Monitoring Plan on December 6, 2017, in accordance with Section 15070 of the State CEQA Guidelines and Section 6.02 of the City's Local Guidelines for Implementing CEQA.
PREPARED BY: CHRISTOPHER L. HORN, P.E., SENIOR CIVIL ENGINEER
REVIEWED BY: TOM KOPER, P.E., ASSISTANT PUBLIC WORKS DIRECTOR
REVIEWED BY: NELSON D. NELSON, P.E., PUBLIC WORKS DIRECTOR
REVIEWED BY: KERRY D. EDEN, ASSISTANT CITY MANAGER/ADMINISTRATIVE SERVICES DIRECTOR
SUBMITTED BY: DARRELL TALBERT, CITY MANAGER
Exhibit “A” - Location Map
Owner: Griffco Land LLC Engineer: Wilson Mikami Corporation
2518 N. Santiago Blvd. 9 Corporate, Suite 100
Orange, CA 92867 Irvine, CA 92606